With Canola in full flower, CBH 9 and CBH 23 round the curve approaching Mollerin on the Beacon Branch
CBH 9 and CBH 23 work up the Cleary bank on the gravel ballasted line towards Beacon
CBH 010, 006, and 008 work eastwards through Forrestfield
On a sunny day, two CBHs work across the salt pan near Goomalling, with storms lashing the area in the previous week and the area being so dry no water has pooled in the salt lakes which usually h... (more)
The fog just clears in time as the sun pierces through on a stormy day in Northam
The Milling branch is often referred to the "roller-coaster branch" amoungst crews because its down one grade and up the next.
CBH 1 and CBH 5 trundle through the grades on the Milling branch on a beautifull winters morning
K 23 empty grain negotiates the grades to the North of Pithara on the gravel
The two CBHs start he climb up the Elphin Bank.