Thanks to the 40 kph speedlimit on the entire network, travelling on the sides and ends of the engines is a common thing between crew members and railfans.
The afternoon service descends to reach the river level near Elbasan. This part of the line was finished in 1973, due to this these type of concrete viaducts was used all over the line.