A trio of Kaiser's Eagle Mountain Railroad GE U33C's have just delivered a train of iron ore to the SP interchange at Ferrum, CA, with Salton Sea in the distance. The units have run around the tra... (more)
After dropping off a loaded iron ore train at the connection with Southern Pacific at Ferrum on the western end of the Eagle Mountain RR the power and caboose head back toward Eagle Mountain.
One of Kaiser Steel's Eagle Mountain RR U30C's showed up at SP's Taylor Yard engine facility for some wheel work.
The Maintenance of Way Shed at Ferum California - Constructed of spent railroad ties (wooden sleepers) and salvaged rails, the maintenance of way shed at Ferum California stands abandon aft... (more)
Maitenance of Way Shed Switch at Ferrum - Loads of iron ore in open gondolas were brought to the small yard at Ferrum located along the Southern Pacific's Sunset Route by the Salton Sea in ... (more)
A trio of Kaiser Steel U30Cs (the heaviest U30Cs ever built) bring a load of iron ore down from the Eagle Mountain Mine. Owned by Kaiser Steel, the Eagle Mountain Railroad connected the mine (and ... (more)
Top of the Wye at Ferrum - Looking at the top of the wye at Ferrum California. Loads of iron ore in open gondolas were brought to the small yard at Ferrum located along the Southern Pacif... (more)
Mfr. 1953.