A new crew has arrived to take over JS6209 for another 12 hr shift on the Sandaoling coal mine railway. Driver and fireman use their bright torch lights to thoroughly inspect the steam locomotiveĀ... (more)
JS6209 steams out of the open pit of the Sandaoling coal mine, tackling the final grueling gradient that slowed down most of the loaded coal trains. Today, all tracks are gone there... See more of... (more)
Having served the coal loading point at the Erjing mine, JS8089 waits to get the green signal for its return to the marshalling yard at Nanzhan. It will be an easy way back with most of the line b... (more)
While an accelerating loaded coal train leaves the pit and races to the coal washery, the next train with empty wagons waits for its turn to move to the loading point at the Sandaoling coal mine. ... (more)
JS8081 has reached the coal washery with another heavy loaded coal train. Soon it will push the emptied train back to the pit and start the turn again. See more of my pictures at https://www.click... (more)