The SDL40-2 CC # 118 built by EMD in 1997 pulls the about 2 kilometer long loaded ore train M6 of the SNIM (Société Nationale Industrielle et Minière) from Zouérate to the port of Nouadhibou a... (more)
The SDL40-2 CC # 118 was delivered to the SNIM in Mauritania in the last order in 1997 (# 117 to # 121). In total there were 21 SDL40-2 built between 1981 and 1997, all are in operation to this da... (more)
When the approximately 650 kilometer long railway line from the port of Nouadhibou to the ore mine near Zouérate was built in Mauritania between 1960 and 1963, MIFERMA (Société anonyme des Mine... (more)
When the approximately 650 kilometer long railway line from the port of Nouadhibou to the ore mine near Zouérate was built in Mauritania between 1960 and 1963, MIFERMA (Société anonyme des Mine... (more)
After several days of traveling through Mauritania, the group from Switzerland met the railroad for the first time at noon that day in Choum. A few minutes later, the empty ore train V5 from Nouad... (more)