"Schalke" diesellocomotive Gmf 234 # 04 "Bernina" of the Rhaetian Railway is running down with train 9430 from Arosa to Chur, above Litzirüti. The two Xac ballast cars have be... (more)
"Schalke" diesellocomotive Gmf 234 # 04 "Bernina" of the Rhaetian Railway pulls the ballast train 9423 from Chur to Arosa above Litzirüti, with two loaded Xac cars.
"Schalke" diesellocomotive Gmf 234 # 04 "Bernina" of the Rhaetian Railway in Chur Sand depot, with track plough Xk # 9141. This track plough was the prototype for other vehicle... (more)
"Schalke" diesellocomotive Gmf 234 # 04 "Bernina" of the Rhaetian Railway is entering Lavin with the driver instruction train 9931 from Scuol-Tarasp to Samedan.
All the four new Gmf 4/4 of the RhB (delivered 2014) are together on display in Preda for the open day of the woksite of the new Albulatunnel which is being drilled parallel to the existing one. G... (more)
The yellow diesellocomotive Gmf 4/4 # 23404 (or D4 Bernina) in the background is pulling the 3 cars of the articular train for the Albula line (AGZ, Albula Glieder Zug) from the standard gauge low... (more)
Diesellocomotive Gmf 4/4 # 23404 (or D4 Bernina) waiting to pull the new Albula Glieder Zug from the lowfloor cars. The 1800 kW locomotive was built by Schalker Eisenhütte in Gelsenkirchen/German... (more)
New Albula Glieder Zug (AGZ, Articular train for the Albula line) for the Rhaetian Railway is onloaded from the standard gauge lowfloor cars to the 1 meter gauge, where diesellocomotive Gmf 4/4 # ... (more)
Today the first 3 cars for a new "Albula Gliederzug" (jointed push pull train for the Albula line) was delivered from Stadler Rail Altenrhein to the RhB in Landquart. The diesel locomoti... (more)