One of the more less inspiring combinations to grace the SSR operations in 2017, quad jumbos are at the front at Ardglen on Thursday 10 August 2017 as 44204, 442s1, 44206, 442s5 and RL304 head to ... (more)
44204-GM22-602-GM22-44206 unload SSR train 7934V on the North Geelong grain loop.
44204-44206-GM27-602-GM22 rattle their way through Altona with 7CK3 empty SSR grain to Dimboola.
An unusual sight on the Canberra branch line was this ballast train with 44204-B61-8049 heading north after a weekend of dropping ballast during a track possession.
SSR's northern grain trains are regularly producing 5 plus locomotives on each train. Here at the Kamilaroi Hwy overpass between Willow Tree and Braefield, 44204, 442s1, 44206, 442s5 & RL304 work ... (more)
Stabled in the SSR compound at Lithgow 43 year old ALCO's 44204 built May 1971-44206 built July 1971 wait in the afternoon sun for their next job.
Loco's 44204 and 44206 are waiting at Dapto station after running around the ballast cleaning train, ready to be piloted to the worksite.
44204 over the high rail at Junee Roundhouse waiting Major engine repairs.