The new 15 kilometer long Ceneri Base Tunnel (CBT) from Camorino in the Magadino plane near Giubiasco/Cadenazzo, called Vigana, to Vezia north of Lugano will officially inaugurated on september 4t... (more)
Re 460 # 084 "Helvetia" is shoving a push-pull train with standard cars type IV towards Bellinzona. This composition is replacing the ICN 671 from Basel to Lugano, on the occasion of the... (more)
Re 460 # 084 "Helvetia" in the new paint scheme is pulling Interregio 2270 St.Gallen-Basel SBB from St.Gallen to Zürich.
This is the south portal of the world's longest railway tunnel, the 57 kilometer long Gotthard Base Tunnel (GBT), which will be inaugurated on first of june this year. The 125 meter long test trai... (more)
Re 460 # 084 is entering the 57 kilometer long (world record!) Gotthard base tunnel with a test train. This test runs are on behalf of Alptransit Gotthard (which built the tunnel), together with t... (more)
Push pull test train for the new 57 kilometer long Gotthard base tunnel (GBT), which will open next year. Re 460 # 084 with a first class Apm, two second class Bpm and a cab car Bt, for up to 200 ... (more)
only Re 460 with the SBB logo on the front of the Locomotive.
SBB Re 460 084 hauls the IR 2414 from Chiasso to Zurich HB, here near Brunnen. As part of a mid-life refurbishment programme, SBB's fleet of 119 200km/h four-axle Re 460 electric locomotives will... (more)
The 119 Re 460 locomotives of the SBB have now reached about half of their lives, they were built between 1992 and 1995. Every day, the locomotives travel a route that would extend 2.5 times aroun... (more)