With 843 having arrived on the right, the 4 bankers to the left wait patiently for 828 to arrive. Once here, the bankers will attach to the head of the train and assist in getting the loaded train... (more)
With stars shining and lights glowing all around, the 4 bankers wait patiently for 828 to arrive. Once here, the bankers will attach to the head of the train and assist in getting the loaded train... (more)
After bringing 843 down to Otira from Arthurs Pass, the 4 bankers wait patiently for 828 to arrive. Once here, the bankers will attach to the head of the train and assist in getting the loaded tra... (more)
DX5483+DC4640 crossing the Claverly Viaduct with the northbound Coastal Pacific Express. 4250hp with less than 400 tons on the drawbar!
A typical NewZealand Freight Train