At the beginning of April, the transport of excavated material from the construction site for the second Gotthard Road Tunnel in Göschenen to Flüelen started. Freight train 67664 from Göschenen... (more)
The excavated material from the construction of the second tunnel tube of the Gotthard road tunnel is transported from Göschenen to Flüelen, where it is dumped in Lake Lucerne to create shallow ... (more)