Running towards the approaching night hours, QJ7119 and 7038 pass the Reshui bridge on the JiTong line. In the future it will be replaced by a new electrified shortcut through the mountains from R... (more)
Chasing QJ7038 and 7119 on their way to Daban. The trains has left the Shangdian summit tunnel already and glides down the slopes on the Eastern site of the Jingpeng pass towards Liudigou and Resh... (more)
Drifting slowly through the curve, QJ7119 and 7038 run their train effortless towrds Reshui and ultimately to Daban. Since the summit near Shangdian, it has been a constant downhill slope. See mor... (more)
QJ7119 was in Daban locomotive depot
I first photographed this QJ in Changchun way back in 1988. The Jitong railway has decided to keep this engine for special purposes.
the "Brickyard" starts its run down 9th St on the way to work the brickyards in Phenix City, AL
The unloading tracks will soon be full with 42 loads trucks and trailers that recently returned from overseas.
Here train I4V is seen pumping up its brakes before heading east. Notethe ice covered trees along with the slight snow cover.