After a long cloud filled chase I was finally able to get this job in full sun at Larch. This was the first connection used by the WC to gain access to the former CNW ore lines around Escanaba. Th... (more)
ACRI 1755,1756,1750 have train 3 the Agawa Canyon Tour leaning into a sharp curve near Heyden.
A call the previous evening had alerted us to this train being powered by a pair of F's. The F's had languished in storage most of the summer and were supposedly not to be ran again. Somehow this ... (more)
AC 1755 heads a nice looking train 1 north through the snow near Bellevue. The south end of the ACR had so much curvature that catching a train not on a curve was an effort. Normally trains 1 and ... (more)