Amtrak Vermonter Train 55 is meeting a northbound CTrail train at WOOD Interlocking in Berlin, CT. On the siding is Work Extra 740, tied down with a Phase 7 GP38-3.
Night In New Haven. Making up the power for an overnight work train in the Parcel G Yard in New Haven, Connecticut, an Amtrak crew approaches AMTK 740 (GP38-3, Phase VII) with AMTK 537 (MP... (more)
Phase VII Standard Cab. An unusual test train was operated out of Amtrak's Albany-Rensselaer Shop on Monday, March 18, 2024. Testing various upgrades, including PTC installation, Train 863 ... (more)
Three To Seven Together. An unusual test train was operated out of Amtrak's Albany-Rensselaer Shop on Monday, March 18, 2024. Testing various upgrades, including PTC installation, Train 864... (more)