Rain still down but it's a great moment for father & his son for taking the swimming train
The Hydraulic Locomotive able to cross the flood to helping Electric Locomotive unable to cross
Hard rain fallen a day before and still raining when I came hear. Heard from my friend that all the trains which passing by this location have to haul by diesel hydraulic locomotive. This kind of ... (more)
Ready leave the shed for loading ballast at Bangil
Actually this position is on the back of main head, it has engine problem while hauled ballast trainset to Mojokerto, the train stop at Sepanjang station, I've been permitted to join on the helper... (more)
Prepare double traction with BB 30134(photo taken from) for hauling 18 freight wagons, BB 30111 will be left at Indro Station to finish shunting job between station and cement factory