BNSF 3664 & 3666 eastbound with a loaded coal train.
BNSF 3664 & 3285 lead 271 empties westbound.
The sunrise is still a few minutes away as Pikes Peak starts to get that alpenglow while BNSF 3664 (ET44ACH) leads a coal train downhill towards Greenland, Colorado.
Sunrise is replacing the blue hour as BNSF 3664 (ET44ACH) leads a coal train through Palmer Lake, Colorado.
A pair of BNSF’s brand new ET44ACH’s lead a test run of a southbound coal load with two more units on the rear of the train working their way up the grade.
A solid set of brand new GE ET44ACH's take the siding at Dalton, NE for a meet with 2 loads.
BNSF 3664 and BNSF 3665 are making their first revenue trip over Colorado's Joint Line as they pull 17,700 tons of Engle Butte Mine coal. These ET44ACH are BNSF's new six-axle Tier IV locomotives.... (more)
BNSF 3664 and BNSF 3665 are making their first revenue trip over Colorado's Joint Line as they pull 17,700 tons of Engle Butte Mine coal. These new ET44ACH are BNSF's new six-axle Tier IV locomoti... (more)
Two of BNSF's new ET44ACH locomotives lead an Engle Butte Mine to Reliant Engery (Perish), TX coal train over the Palmer Divde as it passes through Larkspur. With another two ET44ACH shoving on th... (more)