After traffic has cleared on the both the Missabe sub and the Minntac sub it's now green signals for BNSF 4002 to pull 130 ore cars up to U.S. Steel Minntac to load.
A ballast train pauses in Palmer Lake, CO before continuing in the other direction using the northbound track on October 13, 2017.
BNSF 4002 (Dash9) passes a grain elevator in Westminster, Colorado while taking a freight to Denver.
BNSF 4002, CEFX 6008, BNSF 5067, & NS 6921 power an eastbound manifest. After passing under Route 66 the train will be on the 1960 realignment known as the Crookton cutoff.
BNSF 4002, CEFX 6008, BNSF 5067, & NS 6921 power an eastbound manifest and will be entering the canyon in about a quarter mile.
BNSF 4002 (Dash9) leads a mixed freight through Westminster, Colorado.
BNSF stack train rolls east having conquered Marias Pass.
BNSF 4002 is westbound (Timetable North) on the Thayer South Sub crossing Kentucky Street.
A loaded Southbound iron ore train, with 5 units on the point, crosses the bridge at MP 12.5. Note the large dip just before the bridge.
NS train #168 headed up by a BNSF C44-9W