An eastbound BNSF vehicle train begins its descent of Winston Hill approaching milepost 215 east of Winston, Montana, on June 30, 2020.
A long BNSF power move heads towards LAXT with a bevy of GEs in tow.
A high priority manifest destined for Pasco, Wash. traverses one of the many sags of BNSF's KO Subdivision, also known as the Surrey Cutoff. This sag carries the tracks over the Northern Continent... (more)
BNSF 4081, 1090 and 7911 highball Ransom, headed west with a stack train.
Z-train re-route over the BNSF Wayzata Sub due to the derailment the previous day on the Staples Sub in Fridley, MN
Amtrak #504 heads north with substantial substitute motive power provided by BNSF 4081. This was the fourth northbound Amtrak Cascades in three days which had BNSF locomotives on the point.
The rear end of a loaded grain train continues west through the gently rolling countryside of east-central North Dakota.
BNSF 4081 South, powered by six C44-9Ws, four on the head end, and two DPU on the rear, work up the 2.5% grade toward Tunnel #2.
Westbound BNSF coal train coming through Afton on the Union Pacific Cima Sub
NS 144 Northbound Thru Hamilton
NS 144 Westbound By Four Mile Creek