Three BNSF C44-9W's lead the Denver, Colorado to Provo, Utah trackage rights manifest up the 2% grade at the east end of East Portal Siding on August 15, 2015.
CSXT K689 slowly passes through the small town of St. Johnsville with two BNSF GEVO's on the head.
Descending from the Tehachapi Mountains into Caliente, approaching the big horseshoe curve that will reorient the train west toward Bakersfield.
A pair of GEs runs elephant style with high priority merchandise as the engineer gives a friendly wave.
Having made its way through Abo Canyon, BNSF 4752 heads east toward Mountainair.
BNSF 4752 and company power an eastbound intermodal through the cut at Summit.
Merry Christmas!
BNSF power leads the CSX Q261 autorack train west over the Potomac River after emerging from the tunnel.
BNSF power leads CSX Q296 under the NS H Line east towards Baltimore MD.
BNSF 4752, and the uncommon (in these parts) GP60B, is headed back west with empty grain cars. Canon D20/Canon 18-55 zoom.