Still on the Route 66, after a detour which forced us to leave route 66 for a while, we got back on it at Amboy, right in time to see the unit grain train we saw the day before in Flagstaff. It wa... (more)
A cold crewman gets ready to throw a switch while a well-frosted Dash 9 heads into the Denver Yard in sub-freezing, snowy weather.
On a snowy day with freezing temps, a BNSF crewman gives the word to the engineer of 5302 (Dash9) that the switches have been cleaned and he is OK to proceed.
Slightly different angle of "the Loop"
From rain and mud to snow in less than 30 minutes. A visit to the Slot, revealed a modest amount of snow and the need for snow shoes to reach this perch over looking the BNSF Scenic Sub.
The first, and hottest, of a six train parade of westbounds sees BNSF 5302 hitting the trench near Hawley. Check out the snow drifts on the left side of the trench...hard to believe it's actually... (more)
BNSF GE C44-9W 5302 leads 4940 and 4583 elephant-style down the loop with a westbound trailer train
Z-WSPLAC with a trio of BNSF Dash 9's slowly heads West through Mazon, about to meet with eastbound Z-LACNYC. The gates in the photo were malfunctioning. They stayed down for about 20 minutes bloc... (more)
BNSF 5302 and 2 other BNSF Dash 9s slowly move Westbound with Z-WSPLAC due to the crossing in the distance malfunctioning.
BNSF 5302 leads this northbound train past McLemore with an ex-CNW unit in the second spot.