BNSF 6284 (ES44AC) runs past the signal at Spruce, Colorado as it heads south on the Joint Line.
BNSF 6284 (ES44AC) runs a loaded coal train over the ridge line in Spruce, Colorado as it heads to Palmer Lake.
BNSF 6284 (ES44AC) leads a loaded coal train through a snowy Greenland, Colorado and past some old livestock pens.
BNSF 6284 (ES44AC) runs over an arch stone tunnel as it heads through Spruce, Colorado on the Joint Line.
BNSF 6284 (ES44AC) leads a loaded coal train through Palmer Lake, Colorado as it runs south on the Joint Line.
BNSF coal loads, head south on the Joint Line. (Thank you to Joe B. for acting as tour guide this day.)
BNSF empty coal heads north while BNSF southbound full coal awaits for clearing north of Palmer Lake.
After loading taconite at U.S. Steel Keewatin Taconite (or Keetac ) BNSF 6284 has the signal to head south and off of Minnesota's Iron Range bound for the dock at Allouez, Wisconsin.
southbound coal load, Palmer Lake, CO