A westbound BNSF train follows the Fallbridge Subdivision through the Columbia River Gorge and and passes through Columbia Hills Historical State Park west of Wishram, Washington, on September 29,... (more)
We have known for some time that the signal bridges at Edelstein were on borrowed time, but now it appears that their demise is near. A BNSF "Z" train crosses over from main 2 to main 1, passing ... (more)
BNSF 7340 heads a westbound stack/vehicle train across the causeway that creates Horse Thief Lake along the Columbia River west of Wishram, WA near the crossing into The Dalles, OR. The train is h... (more)
Three elephant-style GE's work their hearts out pulling an eastbound stack train around Trinidad Loop, located on the long 1% climb from the Columbia River up to Quincy.
Twelve BNSF GEs lead a Willow Springs bound Z-train east through Joliet.
The Galesburg, IL, to Barstow, CA, high priority manifest train passes thru the small community of Camden. This is one of the few manifest trains we seen on my trip that was setup in DP mode. The ... (more)
Waiting at MP 18 for track & time work schedule on the tracks to expire.