The BNSF 8769 (DP engine) is headed eastbound around the wye into the north yard while a loaded coal train is coming from the Butte sub into the south yard. A few weeks ago the signal bridge (sou... (more)
Working through the s-curves and over the rolling terrain of Western ND, a brand new SD70ACe leads a Blair Terminal (Seattle) to Logistics Park stack train over the busy single track Northern Tran... (more)
Built on July 31st, 2013, BNSF 8769 looks like she's right off the showroom floor, leading an Eastbound stack train down the hill into Berthold.
The orange snow fence lining the right-of-way is... (more)