After waiting at the end of the double track main in Ooltewah, TN the loaded coal bucket NS 732 (Memphis,TN/BNSF-Juliette,GA) has knocked down the absolute signal at Apison, TN (MP-19.4) and is ma... (more)
BNSF ACe 8799 is making full power pulling the loaded coal train up the grade between Larkspur and Greenland, Colorado.
BNSF ACe 8799 leads a loaded coal on the Joint Line through Greenland, Colorado.
BNSF ACe 8799 pulls a heavy coal over the Santa Fe Bridge in Larkspur, Colorado.
Loaded coal hustles over the fill at Barr Lake State Park. Stormy skies have given way to a happy sun filled ending.
The DPU of an empty northbound coal train creeps through CN Junction onto the BNSF tracks.
Black diamonds from the Eagle Butte Mine in Wyoming negotiate the s-curves in Monument as they continue the downhill journey from the summit at Palmer Lake. In a few days this train will be in Te... (more)
BNSF 8799 leads westbound empties around a sweeping curve east of Litchfield, NE.
Even a peachy SD70MAC looks good with the bluffs along the Mississippi south of La Crosse, WI.
A new shiny SD70ACe arrives at North La Crosse with an empty ore train.