BNSF 8991 & 9822 power eastbound loads.
Another coal train from the Powder River Basin heads towards Houston Power and Light's Smithers Lake power plant.
BNSF SD70ACe 8991 glides into Ludlow with a long stack train.
With a very welcome EMD product on the point, a colourful Long Beach-Chicago Logistic Park stack train heads through the curves west of Ludlow.
This southbound loaded coal train has nearly reached its destination of Ameren Electric's Rush Island plant as it passes through Pevely, Missouri, on the ex-SLSF River Subdivision.
A loaded coal train is passing through the bottoms just north of the confluence of the Missouri and Mississippi Rivers. This is just after dawn on the BNSF Hannibal Subdivision north of St. Louis... (more)
Southbound BNSF coal load climbing toward top of Palmer Divide adjacemt to Spruce siding on normal northbound only main #2
Southbound BNSF coal load climbing into Greenland on normal northbound only main #2