B&P's Warren Local returns to the yard with five cars from United Refining. The short train is crossing the Allegheny River and Pennsylvania Ave simultaneously. In the lead is BPRR GP40 302, at ... (more)
The last ALY painted unit works JB-1 at Johnsonburg.
BPRR 302 and 2 GP40's pull into Erie with interchange traffic for the CSX. This job only runs to Erie twice a week to work a trans-load facility and bring traffic to the CSX.