CC20139 on longhood position brings ballast for distributing around Krenceng station. The ballast had been loaded in Parung Panjang station
CC20139 takes hand-washing after the end of it's run.
Having cut off its train, CC20139 rolls back onto the main track and will soon head west to Yogyakarta locomotive shop.
KA 156 went its way to the storage track after passengers detrained at the final destination, Lempuyangan, Yogyakarta. Folks enjoyed watching the train on a sunny morning..
Wow, very Fantastic. CC20139 " The GE Loco Power" hauled 48 Cement Freight Wagons, passing in the Ijo Curve. It's very rarely moment, usually this GE Loco hauled 20 Cement Freight Wagons for maxim... (more)