A Canadian Pacific stack train traverses scenic Black Canyon west of Ashcroft, British Columbia, in some turbulent weather on the afternoon of September 24, 2015. CP GE AC4400CW No. 8533 and ES44A... (more)
CP power leads a stacker east along the B&O in Fostoria.
Late afternoon wind and clouds swirl over Black Canyon west of Ashcroft, British Columbia, on September 24, 2015, as a colorful westbound Canadian Pacific intermodal train threads the depths of th... (more)
East Bound CP Rail stack train heads past the farm lands at Maple Lake with CP Rail #8533 as the sole power.
CP 2-106 cuts through the green fields in Vaughan with 6,500 ft of train for the intermodal terminal to handle.
Coke loads going south, with a CP road freight right on his block. Two CP southbounds back to back, with only a week to go before INRD-Day.
CP 5767 second unit back in the consist, has a large multi-mark. There is only 3 remaing in this scheme on the CPR.
Waiting for their crew, a CP and CEFX unit idle in the yard as the moon rises.
Westbound unit coal train, slowing for a meet, while holding the main.