A pair of leased Citirail (CREX) GE engines, along with a Union Pacific unit, bring the loaded coal train down the grade bound for Plant Bowen in Stilesboro, GA. Leased/foreign power on a Bowen co... (more)
Leaser power CREX 1518 leads stack train Q121 across the 3,920 foot Salmon River Trestle at New Denmark, New Brunswick.
CREX ES44AC 1518 shoves train Q106 into Jasper.
A pair of leased CREX engines, along with a Union Pacific motor, bring a load of Pennsylvania coal South heading for GA Power's Plant Bowen in Stilesboro, GA. Rarely do we see CSX coal trains in t... (more)
With CREX 1518 doing the honors, CN L551 emerges into Mattoon, where it'll pull down to the south end of the yard and eventually begin switching. Due to Decatur Yard being a mess, CN L551 isn'... (more)
A pair of CREX engines, along with a UP GE bring a loaded coal train Southbound on the Etowah Sub bound for the GA Power Plant in Stilesboro.