On their usual Thursday run to Hamilton, Y121 trudges along at a brisk walking speed on jointed rail. Takes about 90 minutes to make the 10 mile run. Used to be able to read the milepost, but lo... (more)
The Clarksburg Turn arrives from Grafton with a single GP38-2 and a caboose.
Some CSX power rests in Rossford yard with the former B&O coaling tower in the background. This vantage point provided by my car's roof.
The sun is setting on 2654 and 2520 as they make their way back to the CSX yard after pushing a loaded coal train out of town.
After stopping in Grand Rapids for a crew change, N956 continues on its way east to an Essexville power plant with the help of two GP38-2s pushers. About two miles remain before the job is comple... (more)
After stopping in Grand Rapids for a crew change, N956 continues on its way east to an Essexville power plant with the help of two GP38-2s pushers.
The Clarksburg Turn passes MD Tower