The rear DP on N760 helps hold back the weight of the loaded coal train for Brice at the signals at Ashford.
The rear DPUs on N760 shove the loaded coal train South as the clear North End Toe River in a pocket of sun.
CSX 420 leads southbound stack train through Fort Montgomery on River Subdivision.
L620 nears its destination at Raleigh as they join with the NC Line at Fetner.
A southbound autorack train takes the siding in Teaneck to wait its turn into North Bergen yard.
Class One mentalities have changed drastically with their motive power needs in this modern era. When the AC44s were new not one personal would've thought for a minute they'd be used in such small... (more)
CSX CW44AC 420 idles at Social Circle, Georgia early on Memorial Day morning. The depot and coal tower which served the Georgia Railroad still proudly stand overlooking the modern era of class one... (more)
CSX CW44AC 420 idles at Social Circle, Georgia early on Memorial Day morning as a hard reminder of the steam era from the Georgia Railroad lingers overhead.
Last train on the River Sub as the maintenance crew will be working in West Point tunnel shortly.