Eastern Kentucky is still recovering from the 2021 Ice Storm but the railroad keeps chugging on. A relatively short Q693 makes its way south on the Big Sandy Subdivision in the evening light with ... (more)
Westbound crossing over the U.S. Route 50 over pass, N760 is slowly starting to make its way down the grade after detaching the manned helper that is no longer needed to continue west.
Westbound loads bound for Brice North Carolina pause the traffic rush in Bridgeport.
Westbound loads bound for Brice North Carolina glide down grade around the curves in Simpson Passing over the Halfway road crossing.
Northbound CSX L692-06 crossing the bridge at Copper Creek with a short train
After waiting for 30 minutes the stop signal drop to an approach at the south-end siding of Tunnel Hill, GA (MP WA-106.7 SE Tunnel Hill), and CSX W105-20 (Mobile,AL-Wartrace,TN) snakes it way out ... (more)
CSXT ES44AC 760 speeds away from a crew change at Buffalo, NY with Worcester, MA - Chicago Bedford Park, IL train Q019 in tow.
CSXT Q019 approaches CP Draw, as NS C88-07 is tied down to the left.
Mty's ready to go into the coalfields for a refill.
CSX U803 crosses over Boones Creek Rd. headed southbound with a loaded coal train.
CSX U803 heads south with a loaded coal train.
Erwin, TN, to Waycross, GA, manifest freight crosses the Enoree River on the former C&WC RR under a partly cloudy Spring day
Pushers have just exited Pool Point Tunnel and are now entering Breaks GOrge.
Just south of MP 10 is Hills Mills Bridge. Although this location is accessible the area itself is fairly remote. Just north of here the Splash Dam coal loader use to operate years past. It is now... (more)