Cass 2 takes a its turn on the log train bringing up the rear of the three train race.
The engineer for the Bald Knob train lubes up the Shay before departing the depot at Cass
#2 is waiting in the siding for the Bald Knob train to go by
shay #2 waiting at Cass depot for the passenger cars and shay #11 to come from the shops. They will push the train up the hill to avoid getting coal cinders on everybody