Not to many trains are able to maintain track speed up Neys Hill
This is bound for Toronto Agincourt for ballest removal
At MP 94, CP crosses over the Steel River, then through a tall rock cut and followed by the Steel Tunnel. CP #RMS-DC 1, conveyor, caboose-12 axles @ 12:00
This machine digs ballest from the right of way to make ditches. They are running light from Winnipeg to Toronto.