A two unit swing helper shoves on a coal train from the Horse Canyon and Sunnyside mines. Note the single track mainline in place between Colton and Soldier Summit. A second main track would be ad... (more)
Six helper units wait for the their train to be split in Minturn Yard before assuming their position in December 1981. Units in question are 3094, 3065, 3048, 3080, 3057 and 3116.
The heat haze from 3094, 3007, 3024 and 3081 blurs the snowy landscape as they work a westbound freight up grade through Kobe, heading towards Tennessee Pass, in March 1982.