Testing on the FEC
154 leaving Nosrris Yard, crossing over from #1 to #2.
EMD demos catch the 10 a.m. Shelby pusher and are shoving hard in assistance of coal train V383-14 entering The Breaks Interstate Park.
Demos in pusher service on the old Clinchfield RR between Shelbiana, KY and Dante, VA.
It's 7 a.m. at the Shelby service area as a dense fog settles in while EMDX 76 & 75 catch a breather into their eigth day of pusher service.
The EMD demos are about to pass under the 3rd st. bridge while heading for the shop.
Testing on FEC
Probably the most photographed demos ever. Here, NS tries them out on a Macon to C'nooga run.
A yard crew using the EMD Demos to build the empty NS 65Q stone train. The Demos will depart with the train later in the evening.
Demo Engines Taking Emptys Back To Mines
The H68 has crossed the Rockville bridge and are on their way to the mines
The demostrators are heading back to the mines