On their second trial run to Melbourne, brand new hired LDP (Locomotive Demand Power) Downer EDI/EMD-built LDP001 and LDP002 lead CLP10 CLP12 and CLF1 through Marulan on the 7BM7 QR Nationals Bris... (more)
On the second trialrun to Melbourne LDP 001 and LDP002 pass through Marulan in the South of NSW, on 7BM7 service, with CLF1, CLP12 and CLP10 all off line.