The Milford-Bennington Railroad has a stretch of uneven track looking quite precarious as it leaves Milford (Granite State Concrete) and heads to the quarry in Wilton. The locomotive here is pushi... (more)
Back on State-owned track, the MBRR crew throttles up past the Wilton Police Department and over Burns Hills Rd in Wilton, NH. This was the first run of the day and the crew was bringing the empty... (more)
This little RR operation was amazing to watch since there's nothing quite like it around! The SW9 shoves the train, caboose first, up to the quarry, loads the hoppers, and then the locomotive lea... (more)
After receiving permission to occupy the Yard Limits between Wilton and MP-I13 from the Pan Am Railways District 2 Dispatcher, Milford-Bennington continues South. Having been only the second time ... (more)
M&B SW9 shoves empties into Wilton along the Hillsborough Mills Dam on the Souhegan River
Hauling ten cars loaded with stone from the quarry in So. Lyndeborough, Milford-Bennington 901 crosses the Souhegan River.
Hauling ten cars loaded with stone from the quarry in So. Lyndeborough, Milford-Bennington 901 blows for the crossing on NH-31.