Nearing the end of the trip through Jefferson Canyon, an eastbound ballast train continues east as they traverse the 5th Sub.
A Helena-bound train of ballast heads east through Jefferson Canyon.
Ballast loads head through Jefferson Canyon.
A ballast train departs Pipestone as they traverse the 5th Sub eastward.
An empty ballast train shoves west to clear the crossing before loading up.
A ballast train arrives at Pipestone to load for the MRL main.
A ballast train departs Pipestone on the 5th Sub along the former NP Homestake Line.
With their loading nearly complete, a loaded ballast train prepares to depart for Helena.
A ballast train arrives at the quarry in Pipestone to load with a former BHP SD70ACe on the head end.