NECR train 611 nearing the end of its trip to Palmer
New England Central RR SD40-2s 3477, 3474, and 3405 haul southbound train no. 611 on the Palmer Subdivision, accelerating out of Brattleboro, VT on September 13, 2019.
A late running NECR 324 passes through rilurwl Cornish, NH, along the Connecticut River as it makes its way from St. Albans, VT to Palmer, Massachusetts. Led by a quartet of rebuilt SD40/45 varian... (more)
A late running NECR 324 exits the tunnel under the Village of Bellows Falls, Vermont, on the way from St. Albans, VT to Palmer, Massachusetts. Led by a quartet of rebuilt SD40/45 variants, the ora... (more)
A late running NECR 324 is seen along the Connecticut River at South Bellows Falls, Vermont, on the way from St. Albans, VT to Palmer, Massachusetts. Led by a quartet of rebuilt SD40/45 variants, ... (more)
NECR 611 lumbers across the Millers River at Millers Falls with a trio of G&W pumpkins
NECR 611 passes the former Vermont Yankee Nuclear Power Plant in Vernon enroute to Brattleboro, VT on the first day of summer.
New England Central Railroad's SD40M-2 3477 in fresh paint at St. Albans, Vermont. The unit is formerly the NECR 2714 and had previously been in UP yellow/grey colors and was ex-UP 2714, exx-SP 8... (more)