28Q approaches the BSOR diamond at GB with two SD40-2s leading a train of empty multilevels bound for Detroit.
C18 rolls down the BSOR with an empty multilevel train received in interchange from CSXT overnight. The crew left NS' Bison Yard early in the morning with mixed freight for CSX at Frontier Yard an... (more)
149 to Bellevue(left) and 15M to Conway(right) wait for their evening departures as C94(center) prepares to pull a cut of cars out onto the lead to switch on the west end of Bison Yard. The th... (more)
Recent heavy rains have swollen Captina Creek as SD40-2 passes overhead.
A very pleasent change with a EX-CR SD40-2 on the point of Super Stacker 25K.