4 SD40Es shove on the rear of an eastbound coal train that nears the crest of the summit on the Pittsburgh Line.
Helpers finish their assist of an eastbound manifest as the train comes into Altoona.
NS train 16T goes into the siding at Vaughn Summit to meet train 15T. #716
NS train 16T begins it's journey north with some foreign power in the lead. #716
A pair of SD40E helpers bring up the read of westbound intermodal 21Q as it heads down the west slope, passing under the PRR position light signals mounted on a I-Beam bridge in Greensburg, Pennsy... (more)
Helpers on a 954 ballast train glide under the position lights at Summerhill.
With a helper ahead, NS 10G blasts through Portage, PA with the ex-PRR signals standing guard.
A pair of helpers shove an eastbound oil train past the Railfan Park at Cassandra, PA.
A pair of SD40E helpers shove a westbound coal train towards Pittsburgh. An MOW crew is waiting to get time to do a rail replacement. The PRR signal bridge will eventually be removed when NS ins... (more)
When a helper set, hauling two other helper sets, gets pressed into duty as a head end helper. It results in a 9 unit lash up, piled onto the head of an NS 536 coal train. 6 SD40E's and 3 SD60I... (more)
NS Train 10A with SD40E 6317 leading it.