NS 122 eastbound on the NS Illinois Division. Leaves changed late this season and were on they way past peak after 2 days of rain.
Eastbound thru Matewan WV on a lovely early spring morning
In the late evening light, an SD60E brings a westbound intermodal train NS 21Z through Waterloo, IN passing under the soon be replaced NYC era signal bridge.
After 51Q came off the branch in Lula, GA; he gets the clear to head South after PTI brought the conductor to the front. Here we see them take an approach to meet 222 at Chicopee just South of Gai... (more)
Only one “Crescent Cab” unit is all that’s needed for the power of today’s NS 22R as the new crew finishes putting th... (more)
Eastbound stacks pass under the 4 track PRR signal bridge in Derry which once hosted a roundhouse, commuter yard and helper base back in the day...
The missing link Named the “Crescent Cab”, these wide nose cabs were developed with crew safety in mind and built for the SD60E rebuild program began by NS in 2010. The Cro-Magno... (more)
Nothing like Springtime in Southwest Virginia! It's a balmy 80 degrees outside and birds' are chirping along with a pleasant breeze, as No. 202 gallops through the picturesque fields of Crockett, ... (more)