Joint NS-W&LE run thru train Z279 passes the old B&O signals at Foley as the westbound climbs Sand Patch Grade.
W&LE run-through stack train Z279 with NS power approaches Rockwood in this view from the cab of the CSX Rockwood Switcher.
For a short period of time in 1997, the NS and W&LE operated a joint double stack train over CSX. The westbound Z279 smokes it up as it departs the Cumberland Narrows and starts its climb up Sand... (more)