After a day of winter thunderstorms the clouds start to break up as this 251 rumbles past NS Bridge behind a pair of 1980's standard cabs.
Eastbound 10E enters Peru yard for tie down with interesting power.
NS 8719 had an axle freeze up, so Hulcher was called in to lift the unit so an idler axle could be installed for a trip to the locomotive shop.
An RJ Corman crew uses battered NS power to load at the National Coal Baldwin coal prep plant. The New River plant currently loads one unit train a week destined for Georgia Power and should begin... (more)
NS 8719 brings a southbounder out of the storm.
Light snow falling.