The NS 233 pulls back out of the Rickenbacker Intermodal Terminal after leaving a cut of on the siding in the yard, the cars that will continue west after they finish building the train are sittin... (more)
The NS 233 heads under the eastbound cantilever signals for CP Lockbourne, as it heads off of the Lockbourne Siding after working the Rickenbacker Intermodal Terminnal.
Almost to the end of the long bridge that runs over the Scioto River, and the low area next to the river, the 233 with UP power trailing heads though Waverly in the late afternoon.