New Year's Eve Delivery. New York & Atlantic Railway's matched Progress Rail PR20Bs 300 and 301 were heading back to Fresh Pond Yard on local job RS-20 down the Long Island Railroad Bushwic... (more)
New arrivals, Progress rail delivered to the New York and Atlantic railway two new units. PR20B 300 301 as they make their way towards the tunnels to pick up a cut of cars.
Heading eastbound down the mainline the RS70 is on their way to switch One World Recycling on the central branch. The smoke from the wildfires in Canada is back.
After switching at Kleet lumber in Huntington the RS91 is seen crawling through Syosset station making the trip back to Fresh Pond Yard. The RS90 symbol is designated as an extra crew, which this ... (more)
From left: NYA 155:MP15AC, GMTX 2200:GP38-2, NYA 101: SW1001 and NYA 301 PGR PR20B.
"NYA PTC Test on the City Zone"
On August 31st, 2021, New York & Atlantic Railway Extra 301, with Progress Rail PR20B 301 solo, heads west on Track 2 within the "City Zone" area of ... (more)
The Late Nassau Tower. On August 22, 2018, New York & Atlantic Railway RS-41 passed by Nassau Tower in Mineola, New York with NYA 301 (PR20B, Progress Rail, 2016) leading while returning to... (more)
Executive Welcome. New York & Atlantic Railway President Paul Victor came out to inspect the newest pair of arrivals from Progress Rail on March 30, 2016. PR20B 301 was delivered that morn... (more)
An extra crew heads for Huntington with a short drag of cars.