Ontario Northland Railway put together a 4-unit, 4-model, and technically 4-scheme consist on the March 2, Englehart to North Bay, Ontario train 214. Leading the consist is SD75I 2105, heritage-p... (more)
The Englehart Yard Crew puts together tonnage for southbound 214 utilizing SD75I 2105 and SD40-2 1733 Aug 17th.
SD75I 2105 is seen being brought in to Cochrane Shop's #3 track Aug. 11th passing GP40-2's 2200 & 2202 which arrived from Hearst on 514 earlier in the day.
With her ditchlights extinguished because of a mainline meet with a tamper and regulator working the area, SD75I 2105 leading northbound 213 rolls past mile 27 of the Devonshire Subdivision August... (more)
Through an eerily foggy Sunday morning, SD75I 2105 can be seen rolling across the Porcupine River bridge located at mile 103 of the Ramore Subdivision as southbound 308 heads to Englehart from Tim... (more)
A very late northbound 113 rockets north through Otter Lake at mile 13.8 of the Temagami Subdivision with SD75I 2105 and SD40-2 1733 in full throttle February 15th
Southbound 214 rolls around the bend at mile 11.7 of the Temagami subdivision plowing through banks of snow that have built up after a snowfall at North Bay
Southbound 214 rolls through Arclin as the crew calls their arrival in to the RTC at North Bay
Southbound 214 lead by a pair of SD75I's rounds the bend at mile 4 of the ONR Temagami Subdivision
Ontario Northland SD75Is 2105, 2104 and 2103 along with GP38-2s 1809 and 1805 and GP9 1605 parked at the diesel shop in North Bay.
Southbound 214 enters the cautionary limits at North Bay Ontario with newly repainted SD75I 2105.
An Englehart crew switches what will become North Bay bound freight 214 at first light on a Tuesday morning. The crew temporarily used this lashup, ONT 2105 ONT 1730 ONT 1733 to switch the yard be... (more)
Last nights yard job has made up 214's train, and the power will soon come off and go elsewhere.
ONT 2105 is about to pass under the CP Nipigon sub and the Trans Canada Highway.