PGR 36 pulls into Aggregate Industries to pick up two empty cement hoppers.
PGR 36 heads back to Bloomington after pulling two empties from Aggregate Industries.
PGR 36 pulls a pair of empties from Aggregate Industries in south Minneapolis. This is as far as they go on this former MN&S branch.
Siting alone side of James Ave in Bloomington awaiting the return of her prime mover.
With some obvious mechanical issues, Progressive Rail switcher #36 (Ex-Soo 1400) sits in a parking lot next to the Progressive Rail Distribution facility in Bloomington, MN
Progressive Rail Santa Train makes its way along Old Shakopee Road between stops for the children to see Santa.
PGR switcher #36 (Ex-Soo 1400) moves card loads of American Gypsum board at the Progressive Rail Distribution facility.
PGR's Santa Express arrives in Richfield with Mr. & Mrs. Claus and a caboose full of wide eyed kids.