Providence and Worcester B39-8E #3906 leads a WOPR-X through Ashton on a warm March afternoon.
On the night of Tuesday, September 20, 2022, at West Haven Station, Providence & Worcester train CT-2 heads for the Tilcon Plant in Danbury with 25 loads of stone.
Running with the pair of B39-8s long hood forward, Providence & Worcester train CT-1 crosses Wall Street in Cromwell. The train is returning to Middletown after picking up cars in Hartford, which ... (more)
Providence & Worcester train CT-1, with a pair of B39-8s long hood forward, passes by the former New Haven Railroad Wethersfield Station, which is home to the Jones Group Insurance Agency. The sho... (more)
Providence & Worcester RR B39-8 no. 3906 & B23-7 no. 2201 lead westbound train NR-4X over the Willimantic River into Willimantic, CT on April 18, 2009.
After spending the afternoon working Tilcon’s Reeds Gap quarry, CT-1 makes it way south in Wallingford for Cedar Hill yard. Trailing behind the corporate Genesee & Wyoming colors is B40-8 4004, ... (more)
Providence & Worcester CT-1 is about to trip the Stones detector (MP-4.81) at Laydon Ave in North Haven. The three B39-8Es have an easy run south with only 10 loaded stone hoppers from the Reeds G... (more)
Circus staff are enjoying the last few hours of circus train travel, as the RBBB Red Unit train heads for its last-ever show in Providence, RI. This train came over from Hartford, CT via Connectic... (more)
Providence & Worcester B39-8 3906 with a small cut of oil tankers is shutdown for the night at Gateway Terminal in New Haven.
Providence & Worcester train NR-2 rolls through Taft's Tunnel in Lisbon, Connecticut at about 9pm. Taken with an infrared and black & white only modified Canon 30D
Providence and Worcester train CT-1 bisects a local farm as they trek uphill toward the Tilcon Quarry at Rockfall. There, they will drop the majority of their train for gravel loading before cont... (more)