QCM 17 passed Fire LAke with a loaded train.
The Arcelor Mittal's Quebec Cartier Mining Railway weekly freight is seen rolling out of Tunnel 29 on the Southern Subdivision on the way to Mont-Wright. QCM AC4400CW 17 leads the mixed freight t... (more)
QCM AC4400CW 17 passes QR on the South Sub a few minutes after departing Port Cartier.
A set of ore empties begin the climb out of Port Cartier.
An empty Cartier ore train exits the tunnel at Mile 30, a few miles south of the siding at Charles, where it'd meet a loaded southbound.
The dust is still settling after the unfortunate event of another motorist passing by, however, QCM AC4400s 17 and 25 soldier on, northbound.
QCM AC4400CW 17 leads an empty ore train over the Rivière aux Rochers, just south of the siding at Able.
A pair of Cartier AC4400s climb out of Port Cartier, heading north for another load of ore.
A set of ore empties depart the docks at Port Cartier for another load from the mine at Mont Wright.